Construction and laying of gas pipeline (DNO Bandava Gas Station –Kashi Power Plant / Bandava) project in Tawki field in Duhok which is supervised by Kar Group, with a length of 40 Km. and a diameter of 36 inches. The project included the road construction, laying of pipes, welding, excavation, lowering of pipes, pipes burial in addition to the engineering tests. The project was completed within 5 months.
© Lafawebahez 2024 Made with by WebBridge