+964 750 5000151
9.00 am - 05.00 pm

Project Information

  • Client: KAR Group
  • Location:Erbil- Khurmala Oil Field

Crude oil pipeline in Khurmala Oil Field

Construction and Laying of crude oil pipeline in Khurmala Oil Field between (well SL and GPS1) at a length of 4.25 Km and diameter 8”.
Construction and Laying of crude oil pipeline in Khurmala Oil Field between (Makhmour St. and CPS1) at a length of 8 Km and diameter 12”.
Construction and Laying of crude oil pipeline in Khurmala Oil Field between (GPS1 and GTP2) at a length of 2.25 Km and diameter 20”.